S-2.1, r. 14 - Regulation respecting occupational health and safety in mines

Full text
339. During shaft sinking work, the conveyance used for the transport of persons to the site where blasting took place shall be immobilized 25 m (82.0 ft) above the site of the blasting.
From this level, a descent of such a conveyance may be made only following signals sent from the conveyance and at a speed not exceeding 2 m per second (380 ft per minute).
After blasting, only those persons required for examining the shaft may be transported in the conveyance.
O.C. 213-93, s. 339.